HOUSE OF REPRESENTATIVES

H.B. NO.

1587

THIRTIETH LEGISLATURE, 2019

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of the eighteenth representative district.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $83,405,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2019-2020 for the purpose of financing capital improvement projects for the eighteenth representative district, as follows:

1.  To be expended by the department of education:

A.   Aina Haina elementary school, Oahu

Design and construction for a five thousand square foot parking lot on the mauka side on the school; ground and site improvements.

Design                                $    50,000

Construction                          $   450,000

     Total funding                    $   500,000

B.   Aina Haina elementary school, Oahu

Design and construction to add fencing around the perimeter of the school to increase safety; ground and site improvements.

Design                                $    10,000

Construction                          $    50,000

     Total funding                    $    60,000

C.   Aina Haina elementary school, Oahu

Design and construction to extend the administration building for additional meeting space; ground and site improvements.

Design                                $    50,000

Construction                          $   450,000

     Total funding                    $   500,000

D.   Aina Haina elementary school, Oahu

Design and construction for an electrical system upgrade to install air conditioning systems in all classrooms; ground and site improvements.

Design                                $   350,000

Construction                          $ 3,150,000

     Total funding                    $ 3,500,000

E.   Aina Haina elementary school, Oahu

Design and construction of a new roof for buildings H and I.

Design                                $    50,000

Construction                          $   850,000

     Total funding                    $   900,000

F.   Hahaione elementary school, Oahu

Design and construction of a new roof for buildings B and I.

Design                                $    75,000

Construction                          $   500,000

     Total funding                    $   575,000

G.   Hahaione elementary school, Oahu

Design and construction for additional space for student counseling and video production services; ground and site improvements.

Design                                $    50,000

Construction                          $   450,000

     Total funding                    $   500,000

H.   Hahaione elementary school, Oahu.

Design and construction to install air-conditioning systems in all classrooms and a stand-alone photovoltaic system for electrical power.

Design                                $   500,000

Construction                          $ 4,500,000

     Total funding                    $ 5,000,000

I.   Hahaione elementary school, Oahu

Construction for the installation of additional playground equipment for new programs; ground and site improvements.

Construction                          $    60,000

     Total funding                     $   60,000

J.   Hahaione elementary school, Oahu

Design and construction of all-weather rubberized fitness trail around perimeter of school.

Design                                $   100,000

Construction                          $   900,000

     Total funding                    $ 1,000,000

K.   Henry J. Kaiser high school, Oahu

Design, construction, and equipment for new visual and performing arts complex, including an auditorium, a scene shop/science, technology, engineering, and math innovation center, dance studio, film production and broadcast center, art gallery, and graphic arts room; ground and site improvements.

Design                                1,000,000

Construction                          $26,000,000

Equipment                             $ 3,000,000

     Total funding                    $30,000,000

L.   Henry J. Kaiser high school, Oahu

Design and construction to renovate the athletic complex including repair locker room ceiling, bleacher safety railings, stadium LED lights, baseball facility upgrades, and press box renovations; ground and site improvements.

Design                                $   100,000

Construction                          $ 1,000,000

     Total funding                    $ 1,100,000

M.   Henry J. Kaiser high school, Oahu

Design and construction to install improved lighting for all sidewalks and the parking lot.

Design                                $    25,000

Construction                          $   225,000

     Total funding                    $   250,000

N.   Kalani high school, Oahu

Design and construction to install rubberized track and artificial turf on the athletic field; ground and site improvements.

Design                                $   500,000

Construction                          $ 4,500,000

     Total funding                    $ 5,000,000

O.   Kalani high school, Oahu

Design and equipment to install new bleachers in gymnasium.

Design                                $   100,000

Equipment                             $   900,000

     Total funding                    $ 1,000,000

P.   Mayor John H. Wilson elementary school, Oahu

Design and construction of cover over walkway and outdoor student meeting area.

Design                                $   100,000

Construction                            900,000

     Total funding                    $ 1,000,000

Q.   Mayor John H. Wilson elementary school, Oahu

     Design and construction of a new roof for building F.

Design                                $    25,000

Construction                          $   225,000

     Total funding                    $   250,000

R.   Niu Valley middle school, Oahu

     Design and construction of a new roof for buildings B, C, H, I, and J.

Design                                $   150,000

Construction                          $ 1,500,000

     Total funding                    $ 1,650,000

S.   Niu Valley middle school, Oahu

     Design and construction for six permanent Americans with Disabilities Act compliant ramps to replace temporary metal ramps that require regular maintenance; ground and site improvements.

Design                                $    25,000

Construction                          $   150,000

     Total funding                    $   175,000

2.  To be expended by the department of land and natural resources:

A.   Maunalua Bay, Oahu

Design and construction of a new boat loading dock.

Design                                $    35,000

Construction                          $   350,000

     Total funding                    $   385,000

3.  To be expended by the department of transportation:

A.   Kalanianaole highway, Oahu

Design and construction of new bridges over Wailupe stream to improve flood control in Aina Haina.

Design                                $ 3,000,000

Construction                          $27,000,000

     Total funding                    $30,000,000

     SECTION 2.  The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation that are unencumbered as of June 30, 2022, shall lapse as of that date.

     SECTION 3.  The sum appropriated shall be expended by the designated expending agencies for the purposes of this Act.

     SECTION 4.  This Act shall take effect on July 1, 2019.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 18th Representative District; GO Bonds; Appropriation

 

Description:

Authorizes issuance of general obligation bonds and appropriates funds for capital improvement projects for the benefit of the 18th Representative District.

 

 

 