Report Title:

CIP; 19th Senatorial District

Description:

Appropriates funds for capital improvement projects in the nineteenth senatorial district.

THE SENATE

S.B. NO.

1660

TWENTY-SECOND LEGISLATURE, 2003

 

STATE OF HAWAII

 


 

A BILL FOR AN ACT

 

MAKING AN APPROPRIATION FOR THE nineteenth SENATORIAL DISTRICT.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $304,334,000, or so much thereof as may be necessary, for fiscal year 2003-2004, for the following capital improvements in the nineteenth senatorial district:

1. Kaleiopuu Elementary School

A. Design and construction of emergency exit with ramp at rear of school.

Design $15,000

Construction $155,000

Total funding $170,000

B. Construction of concrete fire break in rear of school.

Design $2,000

Construction $14,000

Total funding $16,000

C. Renovation of fire rescue area on second floor of Building G.

Design $5,000

Construction $105,000

Total funding $110,000

D. Design and construction of retaining wall on the entire mauka side of campus.

Design $20,000

Construction $250,000

Total funding $270,000

E. Extend mauka side of fire lanes to have access to school.

Design $3,000

Construction $42,000

Total funding $45,000

2. Mauka Lani Elementary School

A. Design and construction of a two-story

classroom building.

Design $170,000

Construction $2,750,000

Equipment $60,000

Total funding $2,980,000

B. Install elevator in Building A.

Design $15,000

Construction $2,750,000

Equipment $60,000

Total funding $2,825,000

3. Kapolei Elementary School

Traffic lights in the following locations: Intersection of Kumu Iki and Kamaaha Avenue, and intersection of Kuloa and Kamaaha Loop.

Design $60,000

Construction $620,000

Total funding $680,000

4. Makakilo Elementary School

A. Building H classroom air conditioning.

Design $12,000

Construction $63,000

Total funding $75,000

B. Building H, replace existing door with

sealed gasket type.

Design $2,000

Construction $10,000

Total funding $12,000

C. Cafeteria, install windows with security screens.

Design $2,000

Construction $10,000

Total funding $12,000

D. Build walkway and safety rails between buildings

H and C.

Design $8,000

Construction $42,000

Total funding $50,000

E. Install night lighting around campus buildings.

Design $12,000

Construction $63,000

Total funding $75,000

F. Install air conditioning in every room.

Design $12,000

Construction $63,000

Total funding $75,000

G. Install water sprinkling system around campus building.

Design $4,000

Construction $21,000

Total funding $25,000

H. Design and construction of new parking area at

rear of school.

Design $15,000

Construction $85,000

Total funding $100,000

5. Barbers Point Elementary School

A. Design and install sprinkler/irrigation system.

Design $5,000

Construction $125,000

Total funding $130,000

B. Design and construction of paved parking area

along Cophaee Street.

Total funding $53,000

C. Design and construction for air conditioning of classroom and administration buildings

B, C, E, F, G, and H.

Design $150,000

Construction $2,550,000

Equipment $100,000

Total funding $2,800,000

D. Design and construction of an accessible pathway from Building C to grade K playground equipment.

Design $1,000

Construction $5,000

Total funding $6,000

6. Kapolei Family Court Complex

Design and construction $74,500,000

7. Kapolei Public Library

A. Equipment and books $1,000,000

Total Funding $1,000,000

B. Plan, design, construction, and equipment of Phase II.

Plan, design, and construction $12,000,000

Total funding $12,000,000

8. Franklin D. Roosevelt Avenue, Oahu

Extension of Franklin D. Roosevelt Avenue to meet the intersection of Kamokila Boulevard/Kapolei Parkway.

Design and construction $2,500,000

9. Waikele Elementary School

Extension of Parking Lot, lower campus.

Design $15,000

Construction $110,000

Total funding $125,000

10. Kapolei High School

Malama Learning Center

Design and construction $5,000,000

11. Royal Kunia Elementary School

A. Construct the first increment, ground and site improvements, equipment and appurtenances.

Construction $16,000,000

Equipment $100,000

Total funding $16,100,000

B. Design and construct the second increment, ground and site improvements, equipment and appurtenances.

Construction $9,000,000

Equipment $100,000

Total funding $9,100,000

12. University of Hawaii, West Oahu Campus

A. Design and construction of West Oahu Campus, Oahu.

Design $17,100,000

Construction $153,900,000

Total funding $171,000,000

13. H-1 Kapolei Interchange

New interchange

Planning $500,000

Total funding $500,000

14. H-1 North-South Interchange

Planning $500,000

Total funding $500,000

15. Fort Barrette Road widening: Farrington Highway to Franklin D. Roosevelt Avenue

Planning $500,000

Total funding $500,000

16. Kalaeloa roadway improvements

Planning $500,000

Total funding $500,000

17. Makakilo Drive extension for second access road

Planning $500,000

Total funding $500,000

SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended for the purposes of this Act; provided that:

(1) The sums appropriated in items 1 through 7, and 9 through 12 shall be expended by the department of accounting and general services; and

(2) The sums appropriated in items 8, and 13 through 17 shall be expended by the department of transportation.

SECTION 3. The appropriations made for capital improvement projects authorized in this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all appropriations which are unexpended or unencumbered as of June 30, 2006, shall lapse as of that date.

SECTION 4. This Act shall take effect on July 1, 2003.