SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $304,334,000, or so much thereof as may be necessary, for fiscal year 2003-2004, for the following capital improvements in the nineteenth senatorial district:
1. Kaleiopuu Elementary School
A. Design and construction of emergency exit with ramp at rear of school.
Design $15,000
Construction $155,000
Total funding $170,000
B. Construction of concrete fire break in rear of school.
Design $2,000
Construction $14,000
Total funding $16,000
C. Renovation of fire rescue area on second floor of Building G.
Design $5,000
Construction $105,000
Total funding $110,000
D. Design and construction of retaining wall on the entire mauka side of campus.
Design $20,000
Construction $250,000
Total funding $270,000
E. Extend mauka side of fire lanes to have access to school.
Design $3,000
Construction $42,000
Total funding $45,000
2. Mauka Lani Elementary School
A. Design and construction of a two-story
classroom building.
Design $170,000
Construction $2,750,000
Equipment $60,000
Total funding $2,980,000
B. Install elevator in Building A.
Design $15,000
Construction $2,750,000
Equipment $60,000
Total funding $2,825,000
3. Kapolei Elementary School
Traffic lights in the following locations: Intersection of Kumu Iki and Kamaaha Avenue, and intersection of Kuloa and Kamaaha Loop.
Design $60,000
Construction $620,000
Total funding $680,000
4. Makakilo Elementary School
A. Building H classroom air conditioning.
Design $12,000
Construction $63,000
Total funding $75,000
B. Building H, replace existing door with
sealed gasket type.
Design $2,000
Construction $10,000
Total funding $12,000
C. Cafeteria, install windows with security screens.
Design $2,000
Construction $10,000
Total funding $12,000
D. Build walkway and safety rails between buildings
H and C.
Design $8,000
Construction $42,000
Total funding $50,000
E. Install night lighting around campus buildings.
Design $12,000
Construction $63,000
Total funding $75,000
F. Install air conditioning in every room.
Design $12,000
Construction $63,000
Total funding $75,000
G. Install water sprinkling system around campus building.
Design $4,000
Construction $21,000
Total funding $25,000
H. Design and construction of new parking area at
rear of school.
Design $15,000
Construction $85,000
Total funding $100,000
5. Barbers Point Elementary School
A. Design and install sprinkler/irrigation system.
Design $5,000
Construction $125,000
Total funding $130,000
B. Design and construction of paved parking area
along Cophaee Street.
Total funding $53,000
C. Design and construction for air conditioning of classroom and administration buildings
B, C, E, F, G, and H.
Design $150,000
Construction $2,550,000
Equipment $100,000
Total funding $2,800,000
D. Design and construction of an accessible pathway from Building C to grade K playground equipment.
Design $1,000
Construction $5,000
Total funding $6,000
6. Kapolei Family Court Complex
Design and construction $74,500,000
7. Kapolei Public Library
A. Equipment and books $1,000,000
Total Funding $1,000,000
B. Plan, design, construction, and equipment of Phase II.
Plan, design, and construction $12,000,000
Total funding $12,000,000
8. Franklin D. Roosevelt Avenue, Oahu
Extension of Franklin D. Roosevelt Avenue to meet the intersection of Kamokila Boulevard/Kapolei Parkway.
Design and construction $2,500,000
9. Waikele Elementary School
Extension of Parking Lot, lower campus.
Design $15,000
Construction $110,000
Total funding $125,000
10. Kapolei High School
Malama Learning Center
Design and construction $5,000,000
11. Royal Kunia Elementary School
A. Construct the first increment, ground and site improvements, equipment and appurtenances.
Construction $16,000,000
Equipment $100,000
Total funding $16,100,000
B. Design and construct the second increment, ground and site improvements, equipment and appurtenances.
Construction $9,000,000
Equipment $100,000
Total funding $9,100,000
12. University of Hawaii, West Oahu Campus
A. Design and construction of West Oahu Campus, Oahu.
Design $17,100,000
Construction $153,900,000
Total funding $171,000,000
13. H-1 Kapolei Interchange
New interchange
Planning $500,000
Total funding $500,000
14. H-1 North-South Interchange
Planning $500,000
Total funding $500,000
15. Fort Barrette Road widening: Farrington Highway to Franklin D. Roosevelt Avenue
Planning $500,000
Total funding $500,000
16. Kalaeloa roadway improvements
Planning $500,000
Total funding $500,000
17. Makakilo Drive extension for second access road
Planning $500,000
Total funding $500,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended for the purposes of this Act; provided that:
(1) The sums appropriated in items 1 through 7, and 9 through 12 shall be expended by the department of accounting and general services; and
(2) The sums appropriated in items 8, and 13 through 17 shall be expended by the department of transportation.
SECTION 3. The appropriations made for capital improvement projects authorized in this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all appropriations which are unexpended or unencumbered as of June 30, 2006, shall lapse as of that date.
SECTION 4
. This Act shall take effect on July 1, 2003.