Report Title:

CIP; 30th Rep Dist

Description:

Appropriates funding for capital improvement projects in the 30th representative district.

HOUSE OF REPRESENTATIVES

H.B. NO.

1673

TWENTY-SECOND LEGISLATURE, 2003

 

STATE OF HAWAII

 


 

A BILL FOR AN ACT

 

relating to capital improvement projects for the benefit of the thirtieth representative district.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2003-2004.

1. To be expended by the department of accounting and general services:

A. Dole intermediate school, Oahu

Plans, design, and construction of two special education classes by utilizing current unused shop class. New classroom space would provide private changing room and shower facilities for incontinent students as well as a large physical therapy area. Renovation also includes installation of A/C, room dividers, tile flooring, electrical upgrades and lights and kitchenette.

Plans $ 4,000

Design 6,000

Construction 800,000

Total funding $ 810,000

B. Dole intermediate school, Oahu

Design, purchase and installation of student physical education lockers.

Design $ 2,000

Purchase and installation 50,000

Total funding $ 52,000

C. Farrington high school, Oahu

Plans, design, and construction to install a tartan surface track at Kusunoki field.

Plans $ 5,000

Design 25,000

Construction 500,000

Total funding $ 530,000

D. Farrington high school, Oahu

Planning, design and construction of physical education, locker rooms and sports training facility at site of existing swimming pool. Girls have no P.E. locker facilities and training facilities are deteriorated.

Plans $ 5,000

Design 10,000

Construction 750,000

Total funding $ 765,000

E. Ka`ewai elementary school, Oahu

Design, demolition and construction to replace walls and windows for classroom E-24. Wall is cracked because of soil shifting and windows may shatter because of load shifts.

Design $ 5,000

Demolition 5,000

Construction 25,000

Total funding $ 35,000

F. Ka`ewai elementary school, Oahu

Design and construction of temporary shoring of the beam at the corner of building J.

Design $ 2,000

Construction 20,000

Total funding $ 22,000

G. Kalihi elementary school, Oahu

Plans, design, and construction to replace the playground equipment, repave the area, and install padded groundcover under the equipment at upper field.

Plans $ 1,000

Design 4,000

Construction 95,000

Total funding $ 100,000

H. Kalihi Waena elementary school, Oahu

(I) Plans, design and construction of a new library. Current library is converted classroom and books are affected by moisture. Number of books restricted by load bearing factor for second floor classroom.

Planning $ 7,000

Design 15,000

Construction 1,500,000

Total funding $1,522,000

(II) Re-roof buildings A, B & D.

Re-roof buildings because the existing roofs are deteriorating and beginning to bubble, bare concrete in some areas. Re-roofing should be done before school is renovated, which is scheduled for '03 - '04.

Construction $ 355,000

2. To be expended by the department of land and natural resources:

A. Kalihi valley natural history park, Oahu

Plans, design, and construction for the development of Kalihi valley natural history park.

Plans $ 10,000

Design 90,000

Construction 1,900,000

Total funding $2,000,000

3. To be expended by the city and county of Honolulu:

A. Kalihi street between Monte street and Numana road,Oahu

Plans, design, and construction for asphalt sidewalk improvements on Kalihi street between Monte street and Numana road.

Plans $ 5,000

Design 20,000

Construction 250,000

Total funding $ 275,000

SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

SECTION 3. This Act shall take effect on July 1, 2003.

INTRODUCED BY:

_____________________________