Measure Title: | RELATING TO UTILITY LINES. |
Report Title: | Utility Lines; Construction Moratorium; Advisory Committee ($) |
Description: | Establishes a three-year moratorium on the construction and installation of forty-six kilovolt or greater high-voltage electric transmission lines. Establishes an advisory committee to develop a statewide utility undergrounding plan. |
Package: | None |
Companion: | |
Introducer(s): | CASE |
Current Referral: | EEP, CPC, FIN |
Date | Status Text | |
---|---|---|
1/23/2002 | H | Introduced |
1/25/2002 | H | Pass First Reading |
1/30/2002 | H | Referred to EEP, CPC, FIN, referral sheet 5 |
$ = Appropriation measure
ConAm = Constitutional Amendment