Report Title:

CIP; 20th Senatorial District

 

Description:

Appropriates funds for capital improvement projects in the twentieth senatorial district.

 

THE SENATE

S.B. NO.

1570

TWENTY-FIRST LEGISLATURE, 2001

 

STATE OF HAWAII

 


 

A BILL FOR AN ACT

 

MAKING AN APPROPRIATION FOR THE Twentieth SENATORIAL DISTRICT.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $28,049,874, or so much thereof as may be necessary, for fiscal year 2001-2002, for the following capital improvements in the twentieth senatorial district:

1. Barber's Point Elementary School, Oahu

a. Design and construction of library air conditioning. $350,000

B. Design and construction of air conditioning for classroom and administration buildings, B, C, D, E, F, G, H, I. $3,850,000

C. Install rubberized surfacing beneath five newly installed playground equipment sets. $30,000

D. Design and construction of an accessible pathway from building C to kindergarten playground equipment. $5,000

E. Design and install sprinkler/irrigation system. $125,000

F. Design and construction of paved parking area along Tulagi and Cophaee Street (20 stalls). $53,000

Total funding $4,413,000

2. Campbell High School, Oahu

a. Air conditioning for entire school. $11,143,000

B. Regrading of track. $190,000

C. Parking lot lighting improvements. $100,000

D. Construction of girl's locker room. $3,620,000

E. Installation of permanent bleachers for football field. $3,980,000

F. Renovation of athletic trainers' room. $195,000

G. Four tennis courts. $210,000

H. Scoreboard of softball field. $143,000

I. Scorer's booth for softball field. $45,000

J. Announcer's booth with elevator for football program. $400,000

Total funding $20,026,000

3. Ewa Beach Elementary School, Oahu

a. Air conditioning for the entire school. $2,822,000

B. Renovation and upgrade of electrical system. $420,000

C. Convert kitchen and dining hall into classroom, equipment, ground, and site improvements. $995,000

Total funding $4,237,000

4. Ewa Elementary School, Oahu

a. Air conditioning for entire school. $3,960,000

B. Renovation and upgrade of electrical system buildings C and D. $100,000

C. Replacement and repair of chain fence. $17,500

D. Replace glass windows in building L. $20,000

Total funding $4,097,500

5. Holomua Elementary School, Oahu

a. Install concrete slab between building E and K-2 playground equipment. $10,000

B. Concrete slab with playground surface. $15,000

Total funding $25,000

6. Ilima Intermediate School, Oahu

a. Air conditioning for entire school. $5,152,000

B. Landscaping and installation of watering system throughout campus. $200,000

C. Traffic light in front of school. $305,000

D. Parking lot improvements. $211,000

Total funding $5,868,000

7. Kaimiloa Elementary School, Oahu

a. Air conditioning for entire school. $4,450,000

B. Design and construction of eight classroom buildings to replace portables. $3,010,000

C. Design and construction of electrical system. $550,000

Total funding $8,010,000

8. Kaleiopuu Elementary School, Oahu

a. Design and construction of emergency exit with ramp at rear of school. $170,000

B. Construction of concrete fire break in rear of school. $16,000

C. Renovation of fire rescue area on second floor of building G. $110,000

D. Design and construction of a retaining wall on the entire mauka side of the campus. $270,000

E. Extend mauka side fire lanes to have access to school. $45,000

F. Installation of grease trap for serving kitchen basin. $105,000

Total funding $716,000

9. Kapolei Elementary School, Oahu

Traffic lights at the intersections of Kuloa Avenue and Kamaaha Loop, and Kumu Iki and Kamaaha Avenue. $681,000

10. Kapolei High School, Oahu

Phase II. $43,570,000

11. Makakilo Elementary School, Oahu

a. Renovation and upgrade of electrical system. $490,000

B. Install air conditioning in every classroom. $75,000

C. Install new night lighting around all buildings. $75,000

D. Design and construction of new parking area at rear of school. $100,000

E. Build new walkway and safety rails between buildings H and C. $50,000

F. Install water sprinkling system around different campus areas. $25,000

Total funding $815,000

12. Makakilo Elementary School III, Oahu

Land purchase $4,000,000

13. Mauka Lani Elementary School, Oahu

2-story classroom building $3,010,000

14. Ocean Pointe Elementary School, Oahu

Design $1,050,000

15. Pohakea Elementary School, Oahu

a. Air conditioning for entire school. $4,263,000

B. Sidewalk at North Road, makai perimeter of property. $150,000

Total funding $4,413,000

16. Royal Kunia Elementary School, Oahu

Design $1,000,000

Land acquisition $4,000,000

Construction 19,000,000

Total funding $24,000,000

17. Waipahu Intermediate School, Oahu

a. Renovation and upgrade of electrical system. $505,000

B. Design, construction, equipment, and site improvements of cafetorium. $2,995,000

C. Design and construction of eight classroom buildings. $3,010,000

Total funding $6,510,000

18. Kapolei Public Library, Oahu

A. Furniture, equipment, and staffing. $3,100,000

B. Construction of Phase II. $12,000,000

Total Funding $15,100,000

19. Kapolei Parkway, Oahu

Planning, design, and construction of Kapolei Parkway extension from Kapolei Parkway to North/South Road. $4,723,874

20. Fort Weaver Road Improvements, Oahu

A. Traffic surveillance cameras Laulaunui Street to Old Ft. Weaver; construction and design. $660,000

B. Widening. $9,000,000

Total funding $9,660,000

21. Kunia Road Widening, Oahu

Well abandonment and relocation. $1,500,000

22. Farrington Highway to Kalaleloa, Oahu

Widening Fort Barrette Road Plans $500,000

Design $2,500,000

Construction $15,000,000

Total funding $18,000,000

23. Geiger Road to Family Center, Oahu

Design and construction of sidewalks. $1,150,000

24. Intra-Island Commuter Ferry Project, Oahu

Barbers Point, Middle Loch,

Iroquois Pt. $1,000,000

25. Ft. Weaver Rd, Geiger Road to Papipi Road, Oahu

Build sidewalks. $575,000

26. Ft. Weaver Road intersection improvements.

Additional lane at Laulaunui. $500,000

27. Kapolei Judiciary Complex, Oahu

Design and construction. $69,900,000

SECTION 2. The appropriations made for capital improvement projects authorized in this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all appropriations which are encumbered as of

June 30, 2003, shall lapse as of that date.

SECTION 3. The sum appropriated shall be expended for the purposes of this Act; provided that:

(1) The sums appropriated in items 1 to 18 of section 1 of this Act shall be expended by the department of accounting and general services;

(2) The sums appropriated in items 19 to 26 of section 1 of this Act shall be expended by the department of transportation; and

(3) The sum appropriated in item 27 of section 1 of this Act shall be expended by the judiciary.

SECTION 4. This Act shall take effect on July 1, 2001.

INTRODUCED BY: