On Monday, December 11, from 8:00am-5:00pm, we will perform annual maintenance of our website. During this time, some website functionality will be unavailable. Once complete, anything related to the 2023 session will be moved to the Archives. Mahalo for your understanding!

2024 HOUSE AND SENATE SESSION JOB OPPORTUNITIES AVAILABLE NOW

2021 Archives
You are viewing archived information from 2021
SB188     
Measure Title: RELATING TO THE UNDERGROUND CONSTRUCTION OF HIGH-VOLTAGE ELECTRIC TRANSMISSION LINES.
Report Title: Public Utilities Commission; Public Utility; High-voltage Electric Transmission Lines; Electric Transmission Systems
Description: Eliminates the requirement for a public utility to seek approval from the public utilities commission for the underground construction of high-voltage electric transmission lines if certain conditions are met.
Companion:  HB78
Package: None
Current Referral: CPN
Introducer(s): KOUCHI (Introduced by request of another party)
Act:

Sort by Date Status Text
1/25/2021SReferred to CPN.
1/22/2021SPassed First Reading.
1/22/2021SIntroduced.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB188
All Versions of this Measure

Committee Reports
No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.

Testimony
No testimony available at this time.

Hearing Notices
No hearings scheduled