2021 Archives
You are viewing archived information from 2021
Measure Title: |
RELATING TO THE UNDERGROUND CONSTRUCTION OF HIGH-VOLTAGE ELECTRIC TRANSMISSION LINES.
|
Report Title: |
Public Utilities Commission; Public Utility; High-voltage Electric Transmission Lines; Electric Transmission Systems
|
Description: |
Eliminates the requirement for a public utility to seek approval from the public utilities commission for the underground construction of high-voltage electric transmission lines if certain conditions are met.
|
Companion: |
HB78
|
Package: |
None
|
Current Referral: |
CPN
|
Introducer(s): |
KOUCHI (Introduced by request of another party)
|
Act: |
|
Sort by Date | | Status Text |
1/25/2021 | S | Referred to CPN. |
1/22/2021 | S | Passed First Reading. |
1/22/2021 | S | Introduced. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
SB188
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
No testimony available at this time.