2021 Archives
You are viewing archived information from 2021
Measure Title: |
RELATING TO CORRECTIONAL FACILITIES.
|
Report Title: |
Public Safety; Correctional Facilities; Construction; Moratorium; Hawaii Correctional Oversight Commission
|
Description: |
Establishes a moratorium on the construction of any new correctional facilities in the State on or after 7/1/2021, including the planned construction of a new facility to replace the existing Oahu community correctional center. Prohibits the construction of new correctional facilities or the expansion of existing correctional facilities without the approval of the Hawaii correctional system oversight commission.
|
Companion: |
HB1082
|
Package: |
None
|
Current Referral: |
PSM, WAM/JDC
|
Introducer(s): |
NISHIHARA, ACASIO, Shimabukuro
|
Act: |
|
Sort by Date | | Status Text |
2/3/2021 | S | Re-Referred to PSM, WAM/JDC. |
1/29/2021 | S | Referred to PSM, JDC. |
1/27/2021 | S | Passed First Reading. |
1/27/2021 | S | Introduced. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
SB1245
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
No testimony available at this time.