2015 Archives
You are viewing archived information from 2015
SB1225 SD1     
Measure Title: RELATING TO WATER RECLAMATION.
Report Title: Water Scalping; Sewer Mining; Pilot Project; Feasibility Study; Appropriation ($)
Description: Requires and appropriates funds to the department of accounting and general services to establish a water scalping feasibility study and four-year pilot project. Effective 7/1/2050. (SD1)
Companion:  HB1394
Package: None
Current Referral: ENE/GVO, WAM
Introducer(s): KOUCHI
Act:

Sort by Date Status Text
2/18/2015SReport adopted; Passed Second Reading, as amended (SD 1) and referred to WAM.
2/18/2015SReported from ENE/GVO (Stand. Com. Rep. No. 216) with recommendation of passage on Second Reading, as amended (SD 1) and referral to WAM.
2/10/2015SThe committee(s) on GVO recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in GVO were as follows: 4 Aye(s): Senator(s) Dela Cruz, Nishihara, Ihara, Tokuda; Aye(s) with reservations: none ; 0 No(es): none; and 1 Excused: Senator(s) Slom.
2/10/2015SThe committee(s) on ENE recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in ENE were as follows: 3 Aye(s): Senator(s) Gabbard, Galuteria, Ihara; Aye(s) with reservations: none ; 0 No(es): none; and 2 Excused: Senator(s) Green, Slom.
2/3/2015SThe committee(s) on ENE/GVO has scheduled a public hearing on 02-10-15 1:20PM in conference room 414.
1/28/2015SReferred to ENE/GVO, WAM.
1/28/2015SPassed First Reading.
1/28/2015SIntroduced.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SB1225 SD1
All Versions of this Measure

Committee Reports


Hearing Notices
ENE/GVO
2/10/15 1:20P
414