2019 Archives
You are viewing archived information from 2019
HB1090     
Measure Title: RELATING TO ELECTRIC VEHICLES.
Report Title: State Buildings; New Construction; Electric Vehicles; Pre-Wired; Charging Stations
Description: Requires that certain state building construction and reconstruction projects or programs include at least 20 parking stalls that are pre-wired for electric vehicle charging stations.
Companion:
Package: None
Current Referral: EEP/TRN, FIN
Introducer(s): AQUINO
Act:

Sort by Date Status Text
1/28/2019HReferred to EEP/TRN, FIN, referral sheet 6
1/24/2019HIntroduced and Pass First Reading.
1/23/2019HPending introduction.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


HB1090
All Versions of this Measure

Committee Reports
No other committee reports available at this time. You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.

Testimony
No testimony available at this time.

Hearing Notices
No hearings scheduled