2019 Archives
You are viewing archived information from 2019
Measure Title: |
RELATING TO ELECTRIC VEHICLES.
|
Report Title: |
State Buildings; New Construction; Electric Vehicles; Pre-Wired; Charging Stations
|
Description: |
Requires that certain state building construction and reconstruction projects or programs include at least 20 parking stalls that are pre-wired for electric vehicle charging stations.
|
Companion: |
|
Package: |
None
|
Current Referral: |
EEP/TRN, FIN
|
Introducer(s): |
AQUINO
|
Act: |
|
Sort by Date | | Status Text |
1/28/2019 | H | Referred to EEP/TRN, FIN, referral sheet 6 |
1/24/2019 | H | Introduced and Pass First Reading. |
1/23/2019 | H | Pending introduction. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
HB1090
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
No testimony available at this time.