2018 Archives
You are viewing archived information from 2018
Measure Title: |
RELATING TO A CAPITAL IMPROVEMENT PROJECT FOR PRESIDENT THEODORE ROOSEVELT HIGH SCHOOL.
|
Report Title: |
Department of Education; Roosevelt High School; CIP ($)
|
Description: |
Authorizes the issuance of general obligation bonds and appropriates funds from the issuance of those bonds for plans, design, construction, and equipment for a new gymnasium at Roosevelt High School.
|
Companion: |
|
Package: |
None
|
Current Referral: |
EDN, FIN
|
Introducer(s): |
BELATTI
|
Act: |
|
Sort by Date | | Status Text |
11/30/2017 | D | Carried over to 2018 Regular Session. |
1/30/2017 | H | Referred to EDN, FIN, referral sheet 6 |
1/25/2017 | H | Introduced and Pass First Reading. |
S = Senate |
H = House |
D = Data Systems |
$ = Appropriation measure |
ConAm = Constitutional Amendment
Some of the above items require Adobe Acrobat Reader. Please visit
Adobe's download page
for detailed instructions.
HB1493
No other committee reports available at this time.
You may search in our Document Directories if you believe this message is in error. The link is on the home page under Search.
No testimony available at this time.