2016 Archives
You are viewing archived information from 2016
SCR128     
Measure Title: REQUESTING THE DEPARTMENT OF TRANSPORTATION TO BEGIN CONSTRUCTION OF THE LEEWARD BIKEWAY BEFORE THE END OF 2016.
Report Title: Requesting DOT to being construction of the Leeward Bikeway during 2016.
Description:
Companion:
Package: None
Current Referral: TRE, WAM
Introducer(s): GABBARD, CHUN OAKLAND, ESPERO, KIDANI, Dela Cruz, Nishihara, Ruderman, Wakai
Act:

Sort by Date Status Text
3/29/2016SReport adopted, referred to WAM.
3/29/2016SReported from TRE (Stand. Com. Rep. No. 3239), with recommendation of referral to WAM.
3/29/2016SThe committee(s) on TRE recommend(s) that the measure be PASSED, UNAMENDED. The votes in TRE were as follows: 4 Aye(s): Senator(s) Inouye, Gabbard, Kidani, Nishihara; Aye(s) with reservations: none ; 0 No(es): none; and 3 Excused: Senator(s) Chun Oakland, English, Slom.
3/24/2016SThe committee(s) on TRE added the measure to the public hearing scheduled on 03-29-16 1:30PM in conference room 229.
3/16/2016SReferred to TRE, WAM.
3/11/2016SOffered.

S = Senate | H = House | D = Data Systems | $ = Appropriation measure | ConAm = Constitutional Amendment

Some of the above items require Adobe Acrobat Reader. Please visit Adobe's download page for detailed instructions.


SCR128
All Versions of this Measure

Committee Reports


Hearing Notices
TRE
3/29/16 1:30P
229