Report Title:

CIP; 11th Senatorial District

 

Description:

Appropriates funds for capital improvement projects to benefit the 11th senatorial district.

 


THE SENATE

S.B. NO.

1246

TWENTY-FIFTH LEGISLATURE, 2009

 

STATE OF HAWAII

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE 11th SENATORIAL DISTRICt.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2009-2010.

1.   To be expended by the department of education:

A.   King William C. Lunalilo elementary school, Honolulu

Electrical evaluation and electrical panel and circuitry upgrade and installation of additional outlets in classrooms                     $  600,000

Installation of school-wide water sprinkler system                                            500,000

Resurfacing of basketball court and purchase of new hoops                                        200,000

Furniture replacement                         30,000

          Total funding                   $ 1,330,000

B.   Washington middle school, Honolulu

1.   Construction of single story "T" shaped building to serve as a parent and community center.

     Plans                                $   10,000

     Design                                   10,000

     Construction                            200,000

     Equipment                                25,000

          Total funding                   $  245,000

2.   Construction of a new elevator for H building to make science labs and art classrooms accessible to wheelchair students.

     Plans                                $   10,000

     Design                                   10,000

     Construction                            150,000

     Equipment                                25,000

          Total funding                   $  195,000

3.   Retrofit current keyboarding classroom into a digital media studio capable of school-wide live broadcasting as well as digital student work production and electrical upgrade to include air conditioning to preserve digital media equipment.

     Plans                                $    5,000

     Design                                    5,000

     Construction                            100,000

     Equipment                                25,000

          Total funding                   $  135,000

4.   Retrofit of current classroom to permanently separate room from custodial storage space, including removal of steel gratings and a garage style metal door and replacement with regular classroom doors and permanent wall, electrical work to separate light switches, and construction of louvered windows.

     Plans                                $    5,000

     Design                                    5,000

     Construction                            100,000

     Equipment                                10,000

          Total funding                   $  120,000

C.   William McKinley high school, Honolulu

1.   Design, construction, and equipment for expansion of the cafeteria, ground and site improvements, and appurtenances.

     Design                               $  250,000

     Construction                         2,500,000

     Equipment                               100,000

          Total funding                   $ 2,850,000

2.   Design, construction, and equipment for the renovation of building W, ground and site improvements, and appurtenances.

     Design                               $  700,000

     Construction                         9,000,000

     Equipment                               100,000

          Total funding                   $ 9,800,000

D.   Roosevelt high school, Honolulu

1.   Cliff stabilization below F building to provide structural integrity for buildings above the cliff.

     Design                               $  80,000

     Construction                            750,000

          Total funding                   $  830,000

2.   School master plan development to provide clear direction for future capital improvement projects, including identification of land area available for structures to meet school and program needs for the next ten years.

     Plans                                $  200,000

          Total funding                   $  200,000

3.   Renovation and expansion of gymnasium to comply with Americans with Disabilities Act of 1990, including new floor, improvements to boys and girls locker room facilities, upgrade of plumbing system, design of concession area, training room, wrestling/cheerleading practice area, ticket booth, renovation of teacher office area, improvement and increase of seating capacity of gymnasium.

     Design                               $  500,000

     Construction                         5,000,000

          Total funding                   $ 5,500,000

4.   200-stall multilevel parking structure.

     Design                               $   90,000

     Construction                            810,000

          Total funding                   $  900,000

5.   Phase II of auditorium project:  building of bandroom adjacent to auditorium in the Nehoa/Mott-Smith Street corner to enable students to maximize utilization of the auditorium for performances, to include parking and loading area in front of the school.

     Plans                                $  200,000

     Design                                  100,000

     Construction                         5,000,000

          Total funding                   $ 5,300,000

6.   Installation of air conditioning in cafeteria.

     Construction                         $   30,000

     Equipment                                90,000

          Total funding                   $  120,000

7.   Replace and add stadium light poles and lights to meet needs of the new track and field and electrical upgrades.

     Design                               $  200,000

     Construction                         2,500,000

          Total funding                   $ 2,700,000

E.   Lincoln elementary school, Honolulu

1.   Complete the upgrade of air conditioning project.

     Design/plans                         $  500,000

     Construction/labor/supplies          3,000,000

          Total funding                   $ 3,500,000

2.   Repair rock wall in parking lot.

     Design                               $   90,000

     Construction                            850,000

          Total funding                   $  940,000

F.   Royal school, Honolulu

Design, construction, and equipment for a drainage system on the front lawn.

     Design                               $   24,000

     Construction                             36,000

     Equipment                                36,000

          Total funding                   $   96,000

     SECTION 2.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 3.  This Act shall take effect on July 1, 2009.

 

INTRODUCED BY:

_____________________________